// Customer Results
Case Studies
Real numbers from real customers. We protect the privacy of every operation we serve, so company names are never disclosed — but the savings, lead-time improvements, and program changes are exactly what they got.
How a Regional Oil & Gas Company Cut PPE Costs and Lead Times
A regional operator was paying above-market on gloves and waiting 30 days for backordered safety glasses, vests, and hard hats. We rebuilt their PPE program — saving $2,976 annually and cutting lead time by 77%.
How a Clay Product Manufacturer Stopped a Price Increase and Cut PPE Costs Across the Board
Their glove vendor announced a price hike. Instead of accepting it, they called XLI. We reviewed their entire PPE spend — gloves, protective suits, and safety glasses — and sourced every product at a better price. Same exact products. No substitutions.
How a Manufacturing Facility Saved $21,600 a Year on Industrial Controls They Were Already Replacing
A facility was spending $30,000 a year on brand new burner controllers and burner cards. XLI audited their spend, identified a supplier for refurbished and repairable units backed by a two year warranty, and cut their annual cost by 72%.
How an Industrial Manufacturer Eliminated Conveyor Downtime and Got Two Belts for the Price of One
A conveyor belt failed mid-production. The rushed replacement quote came in at $1,450 with a two-day wait and no guarantee. XLI found an in-stock belt, same day, for $1,400 — and it was double the length. The crew cut it in half. One belt on the conveyor. One in spare inventory.
Want results like these?
Send us your current supply list. We'll build a side-by-side comparison within 24 hours. No obligation.
